Our customer, a supplier to the oil and gas industry, provides maintenance services to offshore platforms.

The Challenge

They tasked us with making a timber mock up for two MOL Pig Launcher Valves. They had to replace two large valves on the Piper Bravo platform during the shutdown period and needed to ensure that the removal route was accurate as they intended to mount them on an offshore trolley.

The Result

After in depth discussions the Trojan Crates team clearly understood our customers’ needs and requirements, and developed a plan. By using a timber mock up of the valves they could test them in place. We drew up detailed plans and built the timber mocks ups in our workshop. The mock ups were then taken offshore by the customer and placed on the trolley and the removal route was tested to make sure that everything would work when the actual shutdown took place. By using mock ups to test sizing in advance of the shutdown, the customer avoided any unforeseen problems and kept downtime to a minimum.

Talk To Us!

We want to hear from you! visit our Contact page, call 01224 893311.

Talk To Us!

We want to hear from you! Visit our contact page, call 01224 893311 or fill in this short form and we will get back to you as soon as possible.

Please let us know your name.
Invalid Input
Please let us know your email address.
Please let us know your company name.
Please let us know your message.
Invalid Input
  • aja uk iso 14001 2015
  • aja uk iso 9001 2015
  • OHSAS 18001:2007